Quick answer: Get a detailed written contract before any work or payment, ask about warranty, insurance and who does the work, be careful with large deposits, and treat pressure to sign immediately as a red flag.

1. Will everything be in writing?

Indiana law requires home improvement contracts over $150 to be in writing. A complete contract generally includes the contractor’s name, address and email, a contact person for problems, the address of the job, a reasonably detailed description of the work, the total price or how it is calculated, a payment schedule, estimated start and finish dates, and whether subcontractors or vendors will provide labor or materials. Both you and the contractor should sign it. Verbal promises are not enough.

2. How are changes handled?

Projects change, and the safest way to handle it is a written, signed change order that states what is changing and what it costs. Be wary of anyone who wants to adjust the scope or price on a handshake.

3. How much is the deposit, and when is the rest due?

The Indiana Attorney General’s consumer advice is not to pay more than about a third of the total up front, and to tie remaining payments to completed work. Never pay for the whole job before work begins.

4. Are you insured?

Ask for proof of insurance. If something goes wrong on your property, you want to know the contractor is covered. A reputable contractor will be happy to show you.

5. What warranty do you offer, and what does it cover?

Ask how long the warranty lasts, what it covers and excludes, and how to make a claim. Get it in writing. A craftsmanship warranty covers defects in the installation work itself, while the flooring materials are covered separately by the manufacturer. You can read our warranty as an example of the level of detail to expect.

6. Who will actually do the work?

Find out whether the people on your job are employees or subcontractors, and who will be your contact if there is a problem. The contract should say whether subcontractors or others will supply labor or materials.

7. What experience do you have with my kind of project?

Installing tile is different from installing LVP, and a basement slab is different from a wood subfloor. Ask about similar jobs, and ask to see photos of past work. Reviews and references help.

8. What is included in the price?

Ask specifically about tear-out and disposal of the old floor, subfloor repair and leveling, underlayment, trim and transitions, moving furniture, and how much extra material is ordered for cuts and waste. Comparing quotes only works if each one covers the same things. Our guide to what affects the cost of flooring has a full checklist.

9. Are any permits needed?

Many flooring replacements do not need a permit, but rules vary by city and county, and structural changes can. Ask your contractor, and check with your local building department if you are unsure.

10. Are there any red flags?

In many situations, Indiana homeowners also have a short window to cancel a home improvement contract. Ask your contractor to explain how it works for your agreement.

How we work

We give free, no-pressure estimates with clear options at good, better and best levels, and every installation is backed by our 2-year craftsmanship warranty. Ask us anything on this list, and get our answers in writing.

This guide is general information, not legal advice. For questions about a specific contract, talk to an attorney.

Related service: Old flooring removal and disposal

Frequently asked questions

Does Indiana require a state license for flooring installers?

Indiana licenses some trades at the state level, such as plumbing and electrical, but flooring installation is generally not among them. Some cities and counties have their own rules, so check with your local building department.

How many estimates should I get?

Two or three is a good number. Compare them line by line, since the cheapest number is not always the best value if it leaves things out.

What should a flooring estimate include?

The exact product, the area being covered, tear-out and disposal, prep, trim and transitions, labor, the total price, a payment schedule and start and finish dates.

What if the contractor wants to change the price mid-project?

Any change to the scope or price should be documented in a written change order that you sign before the extra work begins.

Ready for a free, no-pressure estimate?

Tell us about your project and we will follow up to talk through options at a few price levels. We install flooring throughout Putnam, Hendricks and Owen counties.

Keep Reading

More Flooring Guides

Call (765) 752-1613 — Free Estimate